Fran Fruzen Intermediate School

Beloit, WI
This project used precast wall panels and hollowcore to create a gymnasium and floor system for the new Fran Fruzen Intermediate School. An architectural finish of color with a sandblast was used on all panels.

PRECAST ELEMENTS

32,525 sq. ft. of Hollowcore Plank
31 Precast Wall Panels (11,772 sq. ft.)
 

PARTNERS

GC:  JP Cullen
Architect:  Bray Architects
EOR: Ambrose Engineering